08-20-2010, 11:11 AM
0
We are working on it. Now, I know re-models ALWAYS take longer than anticipated, but oh boy.
Hubby had to re-do some plumbing (not a plumber.at.all) as the pix will show, and have had to do other extras.
Took pix with my cell so don't bitch about the quality.
Before: Plain white tile
Water damage to the ceiling in my walk-in closet.
Wall with built in shelf.
Water faucet being changed due to it being a completely different size than the original.
Part of the mess and fun of re-modeling.
New shower tiles. Will have the mosiac insert for decoration.
Hubby had to re-do some plumbing (not a plumber.at.all) as the pix will show, and have had to do other extras.
Took pix with my cell so don't bitch about the quality.
Before: Plain white tile
Water damage to the ceiling in my walk-in closet.
Wall with built in shelf.
Water faucet being changed due to it being a completely different size than the original.
Part of the mess and fun of re-modeling.
New shower tiles. Will have the mosiac insert for decoration.
















except it is a low flush system now.














![[Image: alcatraz-prison-picture2-1.jpg]](http://i17.photobucket.com/albums/b78/lktraz/Sigs%20and%20Avs/alcatraz-prison-picture2-1.jpg)
![[Image: dont_care_offended.gif]](http://i17.photobucket.com/albums/b78/lktraz/Sigs%20and%20Avs/2012%20Bumper%20stickers/dont_care_offended.gif)