09-02-2010, 10:54 AM
0
This started out with a simple tile remodel.
Here's whats "surprised" us so far.
Plumbing didnt match. Hubby changed it, did it wrong, sprung a ginormous spray.
The faucet had a small undectable drip that got EVERYTHING wet.
Hubby read directions wrong on grout and let dry for 2 hrs instead of 20 minutes. Not a good idea.at.all.
Kid pissed in toilet.
Screws for faucet are too long and hit wood supports.
Didnt realize what a bitch working with mosaic would be and how much it shows "mistakes"
There will be more.
Thankfully my mantra is "It is what it is"
Here's whats "surprised" us so far.
Plumbing didnt match. Hubby changed it, did it wrong, sprung a ginormous spray.
The faucet had a small undectable drip that got EVERYTHING wet.
Hubby read directions wrong on grout and let dry for 2 hrs instead of 20 minutes. Not a good idea.at.all.
Kid pissed in toilet.
Screws for faucet are too long and hit wood supports.
Didnt realize what a bitch working with mosaic would be and how much it shows "mistakes"
There will be more.
Thankfully my mantra is "It is what it is"